I am trying to pass some list of items to the view via ViewData to create a drop-down list. This shouldn’t be too difficult, but I’m new to MVC, so I might be missing some obvious Stuff.
The
I am trying to pass some list of items to the view via ViewData to create a drop-down list. This shouldn’t be too difficult, but I’m new to MVC, so I might be missing some obvious Stuff.
The
1. Introduction Because the repeated loading of the CGI interpreter will lower the performance of CGI, FastCGI can keep the CGI interpreter in memory to improve performance
Related address: https:
What are the models and functions of domestic ARM core boards? Professional industrial computer brand promise, high performance, low power consumption, provide professional customization.
The
It’s a bit cheating because there are actually two problems in the title.
As for how to import the 3D model, I think I can pass this .
However, my question is: Can I map textures to imp
You need to choose this by yourself, and it won’t be there by default
Basic tutorial: http://jingyan.baidu.com/article/bea41d43684fa4b4c51be6cf.html
http://jingyan.baidu.com/article/3ae
Original: Using PowerDesigner reverse engineering to export PDM models and generate documents
Recently, it is necessary to refactor and optimize old projects. Since the projects are all years
The original text is from: http://www.voidcn.com/article/p-ubrnpejz-oy.html
Enterprise Architecture Model (EAM) is PowerDesigner 15 The new function, which can display the corporate structure
li> Open PowerDesigner software, select menu file->create new model, or click Keyboard ctrl+N
The Create New Model window pops up, and the model type is Object- Oriented Model, select Class
The original text is from: http://www.voidcn.com/article/p-uoilqgur-oy.html
The Model Report of PowerDesigner is a model-based, project-oriented overview document. It provides a flexible and
The original text is from: http://www.voidcn.com/article/p-rkyhvfes-oy.html
Business processing model
The Business Process Model (BPM) takes business requirements as the starting point,