TFS roll back to change set

See the answer in English> Rollback a changeset in tfs Three
There are a lot of content surrounding this problem to provide solutions, but the answer is not convincing, so I have to post here.

We have two code branches, I merged into one, but other team members saw a lot of coverage in the merged version, so what I want is to roll back the project to the version before merging (x)(x 1) happened.

I have VS 2012 / Eclipse TFS 2011 everywhere.

In Visual Studio 2012, you have several options.

Roll back to a specific version

In Source Control Explorer:

p>

>Right click on the branch you want to roll back
>Click Rollback…
>Select to roll back to a specific version
>Enter the change set number you want to roll back.

< p>Roll back a single change set (you can also perform this operation through the dialog box loaded above)

>Right click on the change set you want to roll back
>Select Roll back the entire changset

Check rollback.

See the answer in English> Rollback a changeset in tfs There are 3 solutions around this problem, but the answer is not Not convincing, so I had to post here.

We have two code branches, I merged into one, but other team members saw a lot of coverage in the merged version, so I thought What I want is to roll back the project to version (x) (x 1) before merging happened.

I have VS 2012 / Eclipse TFS 2011 everywhere.

In Visual Studio 2012, you have several options.

Roll back to a specific version

In Source Control Explorer:

p>

>Right click on the branch you want to roll back
>Click Rollback…
>Select to roll back to a specific version
>Enter the change set number you want to roll back.

Roll back a single change set (you can also perform this operation through the dialog loaded above)

>Right click on the change set you want to roll back
>Select Roll back the entire changset< /p>

Check rollback.

Leave a Comment

Your email address will not be published.